Three decades of leadership in the solar energy sector with an exceptional track record.
End-to-end project management - from concept to commissioning and beyond.
At Agni Solar, we deliver turnkey solar park solutions built on trust, reliability, and long-term performance. Our comprehensive approach ensures seamless execution and sustained excellence throughout the plant's lifecycle.
Maximize your return on investment with our cost-effective solar solutions.
State-of-the-art technology powered by AI for smarter solar performance.
Experience the next generation of solar innovation with Agni Solar’s cutting-edge infrastructure:
Seamless execution with quality assurance at every stage of development.
Lifetime support with 24/7 monitoring and dedicated maintenance services.
Initial consultation to understand energy requirements and detailed feasibility studies to assess site potential and financial viability.
Comprehensive proposals with transparent pricing, detailed design and benefits, and tailored solutions to meet specific client needs.
Best practices for installation, civil and and electrical works and solar plant installation with balance of systems.
Smooth coordination with state electricity boards and guidance and support in all approvals required for grid connectivity.
Activation, thorough performance testing, real-time monitoring setup, and ongoing maintenance with dedicated support.
Clean, renewable energy to power your business operations while reducing your carbon footprint and contributing to environmental sustainability.
Dramatic reductions in electricity costs with predictable energy pricing that protects against volatile utility rates and inflation.
Meet your sustainability objectives and corporate social responsibility commitments while enhancing your brand reputation.
We are very happy with Agni's solar water heating system installed at our Chakan plant since August 2012. It continues to perform well and save us energy costs.
My people were saying that this entire project was implemented extremely professionally. I too felt that you and your team did a great job. Great work, and wish you and Agni Solar all the best.
Agni Solar installed a 412 kWp rooftop solar system at our Pune factory in June 2019 with professionalism and precision. Their expert team ensured a smooth transition, addressing every query efficiently. Now, we save costs and use clean energy. Highly recommended!
We are more than happy & satisfied with the Agni Solar System Pvt. Ltd. They have installed & commissioned off-grid rooftop solar PV system at Precise Technofab India Pvt. Ltd. as per the schedule. Kudos to Agni Solar System Pvt. Ltd. for completing the project very well!!!
Agni Solar System Pvt. Ltd. have completed the installation & commissioning of rooftop solar PV system at Fimakem India Ltd. Agni Solar had completed their job in time as per our quality standard & order.
Agni Solar System Pvt. Ltd. have successfully completed the installation, erection & commissioning of 149.50 KWp rooftop solar PV system at IILM Academy of Higher Learning College of Engineering & Technology, Greater Noida, UP. The scope of work includes design, supply, execution, testing & commissioning of all equipments required for on-grid rooftop solar PV system.
Agni Solar ensures reliability through advanced technology, AI-driven monitoring, predictive maintenance, and 24/7 support for over 30 years of peak performance.
Businesses reduce their carbon footprint, achieve Net Zero goals, and enhance CSR by using clean, renewable energy from Agni Solar.
Yes, SMEs can access cost-effective solar power via Agni Solar's aggregation model, avoiding significant upfront capital or on-site installations.
Agni Solar offers end-to-end support, including consultation, installation, grid coordination, lifetime maintenance, 24/7 support, and continuous monitoring.
Open Access Solar Parks provide 20-30% electricity cost savings and long-term price stability by enabling direct power purchase from solar generators at competitive rates.
A Group Captive Solar Park allows multiple businesses to collectively invest in a solar plant through a Special Purpose Vehicle (SPV). Under India's Green Energy Open Access Rules (2022), participating businesses must collectively hold at least 26% equity in the SPV and consume at least 51% of the generated power. Each participant invests approximately 7–8% of the total project cost as equity, while the remaining 74% is funded by debt or a third-party investor. In return, you receive solar power at your facility via the DISCOM grid — at 30–50% below your current grid tariff — for 15 to 25 years. Group Captive consumers are also exempt from Cross-Subsidy Surcharge and Additional Surcharge, which are levied on standard open access consumers. Agni Solar manages the full process: SPV formation, PPA structuring, MERC approvals, EPC, and lifetime O&M.
In the Opex/PPA model, Agni Solar develops, owns, and operates the solar park entirely. You pay a fixed per-unit tariff under a Power Purchase Agreement — typically 25–35% below your grid rate — with zero upfront investment. In the Group Captive model, you invest approximately 8% equity in the project SPV and receive power at a deeper discount of 30–50% below grid. Group Captive also exempts you from Cross-Subsidy Surcharge, which applies to Opex/third-party models. Choose Opex if you want zero capital commitment and immediate savings. Choose Group Captive if you want the maximum long-term savings and are comfortable with a modest equity investment. Agni Solar offers both — our advisors will model both scenarios for your load profile and recommend the right fit.
Savings depend on your current grid tariff, state-specific open access charges, and the model selected. As a benchmark: under the Opex/PPA model, most C&I businesses in Maharashtra save 25–35% versus their DISCOM tariff. Under the Group Captive model, savings range from 30–50% due to Cross-Subsidy Surcharge exemption. For a business with a monthly electricity bill of ₹5 lakh, Group Captive savings typically amount to ₹18–30 lakh per year. After accounting for open access wheeling and transmission charges, net savings are still substantially above grid rates. Contact us to receive a site-specific savings model based on your actual consumption data.
As per Latest GEOA (Green Energy Open Access) Policy 2023, a contract demand of 100 kw and above, consumer are eligible for availing the benefit from open access.
A separate SEM (Special Energy Meter) shall be installed at client's location which can measure import and export of units towards MSEDCL. The existing TOD meter would be replaced with SEM Meter (ABT Meter).
The typical timeline from signed agreement to first power delivery is 6–9 months. Timelines may vary based on regulatory queue at MERC and grid evacuation complexity. Agni Solar manages all approvals and coordination with the State Load Dispatch Centre (SLDC) — you don't need to deal with any of this directly.